Princeton University Helium Storage Dismantlement

Cippco dismantled a 2,500-gallon liquid helium storage facility located inside Princeton University’s Shiffler Lab support area making room for an upgraded space. The 10,000 lb. storage tank was cut free of its mounting platform, rigged and picked out of the building for recycling off site. All supporting structure including piping and associated equipment were then […]

PECO Cooling Tower

Cippco removed two rooftop cooling towers from the occupied commercial PECO building at 2301 Market, along with the heat exchangers, pumps, duct, piping, motors, inertia pads and support equipment serving them.  All work was completed while the building remained active and its remaining mechanical systems operational. Site logistics precluded crane removal, requiring all material to […]

17 Market West

1701 Market Street was transformed from a 500,000 SF, 18-story, 1950’s office building, into a premier 299-unit residential tower. Originally built in 1957 the structure underwent a complete interior gut while preserving elements of the historic Indiana limestone façade. In an effort to minimize waste and maintain the buildings exterior, 1,560 existing limestone panels were […]

21st Floor of 1835 Market

Located at 1835 Market St in Center City, Eleven Penn Center renovated the 20,000 square foot 21st floor that had been vacant for several years. Cippco completed the demolition and assisted managing associated trades including electrical, HVAC, Painting and Glazing to make the project hassle-free for the building management. The project remained on schedule, clearing […]

Bank of America

This fully-occupied Class-A office park is home to Bank of America. Located in beautiful Yardley, PA, BOA needed room to grow. Cippco completed the interior demolition in record time with no disturbances to the occupied floors below.

Nemours Children’s Advanced Delivery Unit

The Nemours Children’s Health Advanced Delivery Unit compressed a multi-year healthcare project into eighteen months. The $35 million project converted patient rooms in the middle of an active hospital into one of only a few facilities in the country designed specifically for high-risk pregnancies and births. Cippco performed the selective demolition of existing patient rooms […]